Nicet level 3 exam Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Nicet level 3 exam? On this page you'll find 79 study documents about Nicet level 3 exam.

Page 4 out of 79 results

Sort by

Nicet level 1 Review Practice Exam Questions & Answers.
  • Nicet level 1 Review Practice Exam Questions & Answers.

  • Exam (elaborations) • 17 pages • 2024
  • Nicet level 1 Review Practice Exam Questions & Answers. When testing a water level supervisory switch serving a pressure tank a signal shall indicate if the water level _____________from the required level (NFPA 72, Table 14.4.3.2 17 (j) (4) - CORRECT ANSWER rises or falls over 3 inches If combination audible/visible appliances are installed the location of the installed appliance shall be determined by the requirements of _______. (Nfpa 72 18.4.8.1) - CORRECT ANSWER the visible ap...
    (0)
  • $11.49
  • + learn more
NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024

  • Exam (elaborations) • 16 pages • 2024
  • NICET Highway Construction Inspector Level III Practice Exam 1 Question Guide 2024 During installation of traffic loops in the pavement, which three statements apply prior to and during the installation of loop wire? (Choose 3). a) Do not allow vehicular traffic over an open saw cut. b) Do not overlap saw cuts at the corner. c) Thoroughly clean the saw cut of foreign material. d) Use a plastic sleeve where loop wire crosses a joint. - ANSWER a) Do not allow vehicular traffic over an ope...
    (0)
  • $11.49
  • + learn more
NICET Fire Alarm Level 1 Exam Questions and Answers
  • NICET Fire Alarm Level 1 Exam Questions and Answers

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET Fire Alarm Level 1 Exam Questions and Answers When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? - Answer-18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? - Answer-66 inches Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - Answer-21 feet At minimum, when w...
    (0)
  • $12.49
  • + learn more
TFM01 Exam Questions and Answers 100% Pass
  • TFM01 Exam Questions and Answers 100% Pass

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • TFM01 Exam Questions and Answers The fire marshal shall send notice to each examinee of the results of the examination no later than -Answer-30 days If the examination is conducted by a testing service the state marshal shall send notice of the results no later than -Answer-14 days If examination results will be delayed the state marshal shall send notice to the examinee no later than -Answer-90 days A renewal of a registration certificate or license is valid for a period of -Answer-2 yea...
    (0)
  • $12.49
  • + learn more
NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024

  • Exam (elaborations) • 5 pages • 2024
  • NICET Level 2 NFPA 25: Standard for Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems Exam 2024 Chapter 1 - Answer-Administration Chapter 2 - Answer-Referenced Publications (Other NFPA Standards) Chapter 3 - Answer-Definitions Chapter 4 - Answer-General Requirements (Owner's Chapter) Chapter 5 - Answer-Sprinkler Systems (Heads, Hangers, Waterflow Alarm Devices, AF Systems, Dry Pipe Systems) Chapter 6 - Answer-Standpipe & Hose Systems Chapter 7 - Answer-Hydra...
    (0)
  • $11.49
  • + learn more
Nicet Level 2: Utilities, Incidental Construction and Site Layout Exam Questions and Answers
  • Nicet Level 2: Utilities, Incidental Construction and Site Layout Exam Questions and Answers

  • Exam (elaborations) • 3 pages • 2024
  • Available in package deal
  • Nicet Level 2: Utilities, Incidental Construction and Site Layout Exam Questions and Answers What is the required expansion joint spacing for sidewalks? - Answer-not exceeding intervals exceeding 20' What should expansion joints be filled with? - Answer-3/4" joint filled with elastomeric joint sealer or joint filler to entire depth of sidewalk What intervals are contraction joints placed for sidewalks? - Answer-Intervals of 10' How are contraction joints formed? - Answer-utilizing join...
    (0)
  • $10.49
  • + learn more
NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers

  • Exam (elaborations) • 8 pages • 2024
  • NICET Fire Alarm Level 1 Exam Questions And Revised Correct Answers When a device is inaccessible due to excessive height, such as an atrium, what it the maximum interval for testing? - Answer -18 months When installing a wall-mounted fire telephone appliance to the public, what is the acceptable maximum mounting height from the floor? - Answer -66 inches Elevator lobby smoke detectors shall be mounted within a maximum of which distance from the center-line of the door? - Answer -21 fee...
    (0)
  • $12.99
  • + learn more
NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS

  • Exam (elaborations) • 10 pages • 2024
  • Available in package deal
  • NICET LEVEL 1 HIGHWAY CONSTRUCTION EXAM QUESTIONS AND ANSWERS Acceptance - Answer-The written acceptance by the Department of the Work. acceptance testing - Answer-Testing conducted by the Department to measure the degree of compliance to the Contract actual cost - Answer-The computed cost using calculations provided addendum - Answer-A Contract revision or response to a Contractor inquiry issued after advertisement and before the opening of bids. as-built quantity - Answer-The quantity ...
    (0)
  • $12.49
  • + learn more
Nicet Level 2: Concrete Exam Questions and Answers 2024
  • Nicet Level 2: Concrete Exam Questions and Answers 2024

  • Exam (elaborations) • 6 pages • 2024
  • Available in package deal
  • Nicet Level 2: Concrete Exam Questions and Answers 2024 What is the testing frequency for concrete? - Answer-every 50 yards When should you take cylinder samples? - Answer-Every 100 yards What are the components on a batch ticket? - Answer-1. Ticket Number 2. Plant 3. Project Number 4. Mix ID 5. Time of Batch 6. Time arrival 7. Time Discharge 8. Time Completed 9. Mix proportions When should concrete samples should not be taken? - Answer-Before 10% and 90% of truck has been discharge...
    (0)
  • $11.49
  • + learn more
NICET Level 2 Exam questions &  Answers, rated A+[LATEST EXAM UPDATES]
  • NICET Level 2 Exam questions & Answers, rated A+[LATEST EXAM UPDATES]

  • Exam (elaborations) • 7 pages • 2024
  • NICET Level 2 Exam questions & Answers, rated A+ 4 - Consider a room which is 40' square. How many 15cd wall mounted strobes are required to adequately cover this space? Annually - What is the testing frequency of a strobe? 15 - In a corridor application, visible appliances shall be rated not less than ________ cd? 4 hours - Consider a household fire alarm system where the primary power is provided by a circuit that can be switched off by means other than a circuit breaker. The batter...
    (0)
  • $8.49
  • + learn more