Cyb 210 Study guides, Class notes & Summaries

Looking for the best study guides, study notes and summaries about Cyb 210? On this page you'll find 76 study documents about Cyb 210.

Page 4 out of 76 results

Sort by

CYB-210 Module 7 Project Two
  • CYB-210 Module 7 Project Two

  • Exam (elaborations) • 17 pages • 2023
  • Available in package deal
  • CYB-210 Module 7 Project Two. This project was a little more tricker than the other one. With this project we were given 3 networks. Networks A and B needed to be connected into one with a new network scheme. Network 3 and the new network needed to be connected together. With this being said I added a third switch to account for future expansion. I kept the two switches we were given for subnet 1 and 2 and added a third to connect the networks to that switch and then into the router. Doing ...
    (0)
  • $24.49
  • + learn more
CYB-210 Project Two: Network Diagram and Rationale
  • CYB-210 Project Two: Network Diagram and Rationale

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • CYB-210 Project Two: Network Diagram and Rationale. In this scenario we are tasked with combining Subnet1 and Subnet2 into NetworkA, configure static routing between NetworkA and Network3 configure DHCP and DNS services, and NAT configuration for ping capabilities and communication between the networks. To start I decide to delete Subnet2 and shut down the unused port FA0/1 on the Subnet_Router for better security. I than moved all the computers and printers from Subnet2 to Subnet1 and reco...
    (0)
  • $21.49
  • + learn more
CYB-210 Project One Computer Network Modification Brief
  • CYB-210 Project One Computer Network Modification Brief

  • Exam (elaborations) • 13 pages • 2023
  • CYB-210 Project One Computer Network Modification Brief. On the LAN option under the config tab of he router, the IP address is set to 192.168.70.10 (see Figure 3). Verified that the IPconfiguration was set to DHCP on the internet option under the config tab of the router (see Figure 4). Verified that the IP configuration was set to DHCP on the internet option under the config tab of the router (see Figure 5). Configuration is continued in the wireless section under the config tab. The SSID...
    (0)
  • $18.49
  • + learn more
CYB-210 Project One Computer Network Modification
  • CYB-210 Project One Computer Network Modification

  • Exam (elaborations) • 11 pages • 2023
  • CYB-210 Project One Computer Network Modification. The needed hardware is already in the office, so the cameras and wireless router were harvested from the equipment closet. To get the network ready for the new hardware, the existing switch was reconfigured first. After selecting the switch and clicking on the CLI, a command was entered (see Figure 1) to add and name the new VLAN for the wireless router’s “Guest” network. The command was run again to add and name the new VLAN for the ...
    (0)
  • $24.49
  • + learn more
CYB-210 week 6 Project One: Computer Networking Modification.
  • CYB-210 week 6 Project One: Computer Networking Modification.

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • CYB-210 week 6 Project One: Computer Networking Modification. The needed hardware is already in the office, so the cameras and wireless router as well as the tablet and smart phone were gathered from the equipment closet. To start off the scenario I first got the network ready for the new hardware, by reconfiguring the existing switch. After selecting the switch and clicking on the CLI, a command was entered to add and name the new VLAN for the wireless router’s “Guest” network. The C...
    (0)
  • $19.49
  • + learn more
CYB-210 Project Two: Network Diagram and Rationale
  • CYB-210 Project Two: Network Diagram and Rationale

  • Exam (elaborations) • 12 pages • 2023
  • Available in package deal
  • CYB-210 Project Two: Network Diagram and Rationale. In this scenario we are tasked with combining Subnet1 and Subnet2 into NetworkA, configure static routing between NetworkA and Network3 configure DHCP and DNS services, and NAT configuration for ping capabilities and communication between the networks. To start I decide to delete Subnet2 and shut down the unused port FA0/1 on the Subnet_Router for better security. I than moved all the computers and printers from Subnet2 to Subnet1 and reco...
    (0)
  • $22.49
  • + learn more
CYB-210 Module 7 Project Two
  • CYB-210 Module 7 Project Two

  • Exam (elaborations) • 17 pages • 2023
  • CYB-210 Module 7 Project Two.
    (0)
  • $25.49
  • + learn more
CYB-210 7-2 Project One Network Diagram and Rationale.
  • CYB-210 7-2 Project One Network Diagram and Rationale.

  • Essay • 7 pages • 2023
  • Available in package deal
  • CYB-210 7-2 Project One Network Diagram and Rationale. Network Design Rationale 1. New Ip Configuration to combine existing subnets Subnet1 and Subnet2 were merged to form Network A. The secondary router from Subnet two was required, and a new configuration was built using 192.168.1.1 as the gateway. All clients were assigned a static IP within the given scope. Additionally, the now unused port FA 1/0 was closed on the Subnet_Router per security best practice. To confirm communication fun...
    (0)
  • $7.99
  • + learn more
CYB-210-Q3404 Project One Computer Networking | Computer Network Modification
  • CYB-210-Q3404 Project One Computer Networking | Computer Network Modification

  • Exam (elaborations) • 11 pages • 2023
  • Available in package deal
  • CYB-210-Q3404 Project One Computer Networking | Computer Network Modification. This assignment will describe the steps take to construct the network to adhere to the requirements per the scenario given for the network provided. I have provided the screenshots so as to better show my work. The following was to be completed:  Add free guest wireless internet for the customers  Install cameras that monitor the front desk and the waiting area.  Reconfigure the current network to suppo...
    (0)
  • $18.49
  • + learn more