The Virginia Stormwater Management Program is authorized by the ______ and administered through the ______ - CORRECT ANSWER Virginia Stormwater Management Act, Virginia Stormwater Management Program Regulation VPDES Permit/Construction GP authorizes discharge of stormwater from construc...

[Show more]

Preview 3 out of 16  pages

  • August 12, 2024
  • 16
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • SWM DEQ
  • SWM DEQ
avatar-seller
NURSINGTRAINER
UPDATED SWM DEQ 2024-2025 QUESTIONS
WITH VERIFIED SOLUTIONS
The Virginia Stormwater Management Program is authorized by the ______ and
administered through the ______ - CORRECT ANSWER Virginia Stormwater
Management Act, Virginia Stormwater Management Program Regulation



VPDES Permit/Construction GP authorizes discharge of stormwater from construction
activities that are - CORRECT ANSWER greater than or equal to an acre



The Stormwater Management Act requires the State Water Control Board to -
CORRECT ANSWER permit, regulate, and control stormwater runoff



DEQ has ___ days to complete review of real or potential inter-jurisdictional impacts
upon request - CORRECT ANSWER 90



The Stormwater Management Act requires the following individuals to obtain and
maintain a certificate of competency - CORRECT ANSWER staff of a stormwater
program, anyone contracted by a VSMP authority, standard and specification holders



The dual certificate will expire three years from - CORRECT ANSWER the latest date
of the certificates



SWM plan must be approved by ___ before land disturbance - CORRECT ANSWER
VSMP program authority



The water quality criteria sets a site-based load limit of ____ of total phosphorus for new
development - CORRECT ANSWER 0.41 lbs/acre/year

,UPDATED SWM DEQ 2024-2025 QUESTIONS
WITH VERIFIED SOLUTIONS

The phosphorus load limit uses the - CORRECT ANSWER 10% impervious cover



Part II B and II C water quantity criteria addresses - CORRECT ANSWER channel
protection and flood protection



Which two plans in the SWPPP must be approved? - CORRECT ANSWER SWM plan,
ESC plan



Does the SWM plan address runoff during or after construction? - CORRECT ANSWER
post-construction



What is the lower limit of the range of imperviousness that can result in stream
degradation? - CORRECT ANSWER 10%



What do land disturbing activities consist of? - CORRECT ANSWER excavating,
clearing, grading



LDA threshold for the SWM Act and Regulation - CORRECT ANSWER 1 acre or 2500
square feet for Chesapeake Bay Preservation Act



In situations where an initial exemption was applicable because LDAs were related to
emergency work, VSMP authority shall be advised of the disturbance within -

, UPDATED SWM DEQ 2024-2025 QUESTIONS
WITH VERIFIED SOLUTIONS
CORRECT ANSWER 7 days of commencing the LDA and shall submit a permit
application within 30 days of starting the land-disturbing activity



Localities with MS4 - CORRECT ANSWER must adopt and administer a stormwater
program



Localities without MS4 - CORRECT ANSWER may choose to administer a VSMP or
have DEQ administer the program



DEQ is responsible for enforcing the ____ while locality ____ are responsible for
enforcing local ordinances - CORRECT ANSWER Construction GP, VSMP



A locality VSMP authority must include enforcement authority and a schedule of civil
penalties for enforcement actions in its local ordinance. The maximum penalty the
authority may issue is - CORRECT ANSWER $32,500 per violation per day



Any civil penalty assessed by a court as a result of a summons issued by a locality VSMP
authority must be paid - CORRECT ANSWER into the locality's treasury



Any person who violates..... shall be subject to a civil penalty not to exceed -
CORRECT ANSWER $32, 500



Chesapeake Bay Preservation Areas that result in a land disturbance greater than or
equal to ____ and less than ____ - CORRECT ANSWER 2,500 ft^2, 1 acre

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller NURSINGTRAINER. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $11.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

74735 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$11.49
  • (0)
  Add to cart