100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached
logo-home
GCOR Exam 1 Study Set Questions and Answers 100% correct $12.49   Add to cart

Exam (elaborations)

GCOR Exam 1 Study Set Questions and Answers 100% correct

 5 views  0 purchase
  • Course
  • Gcor
  • Institution
  • Gcor

GCOR Exam 1 Study Set Questions and Answers 100% correct Absolute Block A length of track that no train is permitted to enter while the track is occupied by another train. Absolute Signal A block or interlocking signal without a number plate, or designated by an A marker. Articulat...

[Show more]

Preview 2 out of 7  pages

  • August 6, 2024
  • 7
  • 2024/2025
  • Exam (elaborations)
  • Questions & answers
  • Gcor
  • Gcor
avatar-seller
Pogba119
GCOR Exam 1 Study Set Questions and
Answers 100% correct
Absolute Block - answer A length of track that no train is permitted to enter while the
track is occupied by another train.

Absolute Signal - answer A block or interlocking signal without a number plate, or
designated by an A marker.

Articulated - answer Permanently connected multiple unit cars that share a common
truck.

Automatic Block Signal System (ABS) - answer A series of consecutive blocks
governed by block signals, cab signals, or both. The signals are activated by a train or
by certain conditions that affect the block use.

Automatic Cab Signal System (ACS) - answer A system that allows cab signals and
the cab warning whistle to operate automatically.

Automatic Train Control (ATC) - answer A system to enforce compliance with cab
and wayside signal indications. If the train exceeds a predetermined speed for a given
signal indication and speed is not reduced at a sufficient rate, brakes are automatically
applied.

Block - answer A length of track:

× between a consecutive block signals.

× between a block signal in the end of block system limits.

or

× in ATC limits the use of which is governed by cab signals and or block signals.

Block Signal - answer A fixed signal at the entrance of a block that governs trains
entering and using that block.

Block System - answer A block or series of consecutive blocks within ABS, ACS,
CTC, or interlocking limits.

Cab Signal - answer A signal in the engineer's compartment or cab that indicates a
condition affecting train movement. Cab signals are used with interlocking or block
signals or without block signals.

, Cars - answer Railroad cars.

Centralized Traffic Control (CTC) - answer A block system that uses block signal
indications to authorize train movements.

Clearance Point - answer The location closest to a switch where it is safe for
equipment, and a person riding the side of equipment unless prohibited, to pass
equipment on an adjacent track.

Conductor - answer Crew member in charge of train or yard crew.

Control Operator - answer Employee assigned to operate a CTC or interlocking
control machine or authorized to grant track permits.

Control Point - answer The location of absolute signals controlled by a control
operator.

Controlled Sidings - answer A siding within CTC or interlocking limits where a signal
idlndication authorizes the siding's use.

Crew Member - answer Conductors, assistant conductors, brakemen, engineers,
remote control operators, yard engine foremen, switchmen, and yard helpers.

Crossover - answer A track connection between two adjacent, not necessarily
parallel tracks, consisting of a minimum of two switches, which is intended to be used
primarily for the purpose of crossing over from one track to another.

Current of Traffic - answer The movement of trains on a main track in one direction,
as specified by special instruction.

Distant Signal - answer A fixed signal outside a block system that governs the
approach to a block signal, interlocking signal, or switch point indicator. A distant signal
does not indicate conditions that affect track use between the distant signal and block or
interlocking signals or between the distant signal and switch point indicator. A distant
signal is identified by a D.

Double Track - answer Two main tracks where the current of traffic on one track is in
a specified direction and in the opposite direction on the other.

Dual Control Switch - answer A power-operated switch, moveable point frog, or
derail that can also be operated by hand.

Engineer - answer Also includes student engineers, firemen, hostler, and remote
control operators.

The benefits of buying summaries with Stuvia:

Guaranteed quality through customer reviews

Guaranteed quality through customer reviews

Stuvia customers have reviewed more than 700,000 summaries. This how you know that you are buying the best documents.

Quick and easy check-out

Quick and easy check-out

You can quickly pay through credit card or Stuvia-credit for the summaries. There is no membership needed.

Focus on what matters

Focus on what matters

Your fellow students write the study notes themselves, which is why the documents are always reliable and up-to-date. This ensures you quickly get to the core!

Frequently asked questions

What do I get when I buy this document?

You get a PDF, available immediately after your purchase. The purchased document is accessible anytime, anywhere and indefinitely through your profile.

Satisfaction guarantee: how does it work?

Our satisfaction guarantee ensures that you always find a study document that suits you well. You fill out a form, and our customer service team takes care of the rest.

Who am I buying these notes from?

Stuvia is a marketplace, so you are not buying this document from us, but from seller Pogba119. Stuvia facilitates payment to the seller.

Will I be stuck with a subscription?

No, you only buy these notes for $12.49. You're not tied to anything after your purchase.

Can Stuvia be trusted?

4.6 stars on Google & Trustpilot (+1000 reviews)

76658 documents were sold in the last 30 days

Founded in 2010, the go-to place to buy study notes for 14 years now

Start selling
$12.49
  • (0)
  Add to cart